Route 2027
The south side of Asapurna
NEPAL · ANNAPURNA MASSIF7,140 m
In spring 2027 we plan to return to Asapurna — Gangapurna West, a 7,140-metre peak in the Annapurna massif. The expedition will be based on the southern route, a significant part of which our team studied in autumn 2026. We have to climb the upper snow and ice wall, reach the summit ridge and find the continuation of the way to the highest point. The goal of the expedition is to make the first confirmed ascent of Asapurna and bring the whole team home.
Experience of previous expeditions
The southern direction was chosen on the basis of the experience of previous expeditions. In 2016 the Korean climbers Kim Chang-ho, Choi Seok-mun and Park Jong-yeon climbed on this side of the mountain. Two of them reached the summit ridge, achieving, according to the Himalayan Database, about 7,040 metres. They stopped the attempt in order to return to a companion who had halted lower down because of insufficient acclimatisation. The summit remained unclimbed.
The 2026 Russian expedition worked in the same general direction. Natalia Zanina, Maxim Trufanov and Ruslan Kirichenko climbed to about 6,800 metres; the team leader Valery Shamalo was in a camp at about 6,400 metres. Worsening weather and increasing snow slides forced them to end the climb. All four returned safely. The expedition provided detailed information about the approaches, possible campsites, the condition of the terrain and the difficulties of the upper wall.
The Korean and Russian lines are close in general logic: approach from the south, climb along the spur, passing snow and ice steps and reaching the foot of the wall. The exact overlap of individual sections remains to be clarified. Over ten years the ice terrain has changed, and the condition of the snow can change the route significantly even during a single expedition.
Route scheme

- 6300
- 6500
- 6800
- 6300 Camp at about 6,300 m
- 6500 Reaching the upper wall
- 6800 Highest point of the 2026 team
From Machapuchare to the upper wall
The way to the mountain begins near the Machapuchare base camp, at about 3,700 metres. This is where the developed part of the approach ends. Further on you have to descend to the river, organise a crossing and enter a little-visited side valley. On the way there are rock bluffs, scree, additional crossings and sections that require protection.
The small elevation gain on this stretch is deceptive. Before climbing higher you have to lose height, bypass obstacles and look for passages. A strong current and rockfall make the approach a mountaineering task in its own right. At about 4,100 metres there are platforms used by previous expeditions.
Higher up the route goes through scree and gullies to open snow slopes. In 2026 deep snow lay here, and the team used snowshoes. From about 5,200 metres there are sections of technical movement with protection. At about 5,300 metres there is a large platform that served as one of the main campsites.
The further climb goes through a gully to the ridge, then along alternating snow slopes, steep steps and ledges. On the previous expedition the participants spent a night at about 5,800 metres; another possible platform is at about 6,050 metres. Before reaching the upper plateau you have to overcome several steep roped sections. One of the most difficult is directly under the plateau, at about 6,400 metres.
The upper wall and the summit ridge
This is where the defining part of the route begins. The traverse under the upper wall leads to about 6,500 metres. Further on there is steep snow and ice terrain cut by gullies, and the exit onto the summit ridge.
The main difficulty of the wall is protection. Snow, dense firn and uneven ice require a constant search for suitable places for anchors. A direction that is convenient for movement does not always allow the rope team to be reliably protected. Work slows down, and altitude increases the expenditure of strength and the time needed for every action.
According to a preliminary estimate by Valery Shamalo, about 15–16 rope pitches may be needed from the base of the wall to the ridge. The exact length is still to be established. After reaching the ridge there remains a separate task: to assess its condition, possible cornices and the duration of the movement to the summit.
From the turning point of the Russian team to the height of the summit there were about 340 metres of vertical gain left. This figure does not reflect the length and difficulty of the remaining route. Our team has not yet climbed the section above 6,800 metres.
Conditions and tactics 2027
Avalanches, falling ice and the placement of high camps require special attention. The gullies of the upper wall collect sliding snow. Solar heating changes the state of the surface, and snowfall can quickly complicate both the ascent and the return. A gentle platform under the wall may also lie in the path of slides, so the choice of a place for the night must take into account all the terrain above it.
In preparing the 2027 expedition the key questions are acclimatisation, the real pace of the whole rope team, a reserve of equipment for the descent and the possibility of a night in the upper part of the route. Such an option is considered only if a suitable place and acceptable conditions exist. The tactical calculation must cover the full way until the group returns.
Spring conditions will have to be assessed anew. Less loose snow may make trail-breaking easier while exposing ice sections and gaps. That is why the experience of 2026 will be the basis for decisions on site, and the team will determine the final line of movement and the placement of camps according to the actual state of the mountain.